Down and Out
The SUNY New Paltz campus was left in the dark and disconnected last week courtesy of Hurricane Irene. The campus Internet and cable services were cutt off from power from Sunday, Aug. 28 through Tuesday, Aug. 30, as a result of the storm’s severity. The torrential downpour became an issue when the rains gushed down the loading dock and the entire parking lot outside of Haggerty Administration Building (HAB) filled up, according to Assistant Vice President of Technology, Jonathan Lewit.[…]