Bevier Hall To Close For Renovations In Dec. 2016
Starting in December of 2016, Bevier Hall will be closed to undergo renovations. The residence hall, located at the edge of South Manheim Blvd. and […]
Starting in December of 2016, Bevier Hall will be closed to undergo renovations. The residence hall, located at the edge of South Manheim Blvd. and […]
Beyond the blue fences and “Pardon Our Appearance” signs of the Wooster Science Building (WSB) construction site, a duotone orange and black warrior fires an […]
The Route 32 parking lot is currently under construction to expand the existing lot, Director of Facilities, Design and Construction John McEnrue said. McEnrue said […]
Copyright © 2024 | WordPress Theme by MH Themes