Library Main Floor Will Close For Construction
Construction on the main floor of the Sojourner Truth Library (STL) is set to begin at the end of the 2014 spring semester and […]
Construction on the main floor of the Sojourner Truth Library (STL) is set to begin at the end of the 2014 spring semester and […]
In an email sent out on Friday, Nov. 9, Assistant Vice President of Technology Jonathan Lewit addressed the issue of students overprinting on campus. In […]
Major renovations of the Sojourner Truth Library’s (STL) main floor were planned to begin in August, but have been temporarily suspended, John Mc Enrue, director […]
Copyright © 2024 | WordPress Theme by MH Themes