Last Residence Hall Goes Through Asbestos Abatement
Over the summer the last affected New Paltz residence hall, Bliss, underwent asbestos abatement. A campus-wide asbestos survey was done in 1987 to help determine […]
Over the summer the last affected New Paltz residence hall, Bliss, underwent asbestos abatement. A campus-wide asbestos survey was done in 1987 to help determine […]
The Old Main Building restorations are complete and the building will be re-dedicated to the campus community during the ribbon cutting ceremony on Friday, May 11 at 11 a.m. “Having the School of Education back in the main part of the campus makes us all feel a stronger connection to the campus community and allows more interactions between students and faculty,” Interim Dean of the School […]
It’s back to the drawing board for the proposed science building on SUNY New Paltz’s eastern corner. Changes are currently underway to the original design of the building, which would sit on the corner of Plattekill Avenue and North Manheim Boulevard, as obstacles in multiple areas […]
Copyright © 2024 | WordPress Theme by MH Themes